Skip to product information
1 of 9

KastKing KONG Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Resin Technology, Stainless-Steel Double-Foot Guides w/Titanium Oxide Rings, Non-Slip Handles, Chartreuse Strike Tips - size: 7'0''-M-Fast-2pcs, style: Spin

KastKing KONG Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Resin Technology, Stainless-Steel Double-Foot Guides w/Titanium Oxide Rings, Non-Slip Handles, Chartreuse Strike Tips - size: 7'0''-M-Fast-2pcs, style: Spin

Regular price $132.78 USD
Regular price Sale price $132.78 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.

About this item

  • Powerful S-Curve Graphite Rod Blanks - KastKing KONG series rods are designed for anglers targeting massive fish in fresh and saltwater! These lightweight, powerful, 100% graphite blanks are made of high-strength S-Curve graphite reinforced with Nano-Resin technology that delivers amazing strength and lifting power but are still incredibly light and sensitive.
  • Stainless-Steel Double Foot Guides – Because KastKing KONG rods are made to handle giant fish, every component must be up to the challenge. We use only stainless-steel, double foot guides because of their strength and each guide has an ultra-smooth Titanium Oxide ring which is designed to perform flawlessly with heavy braided line. The combination of strong frames and durable rings are perfect for extreme conditions.
  • High-Strength Components – When targeting big fish, every component must be up to the challenge. We use extra strong graphite reel seats with nylon reinforcement to ensure that large reels stay secure. Custom handles feature an EVA core for comfort and a rubber cross wrap for durability. Foregrips have a spiral cross wrap with finger slots that provide control over big fish. Some models also include graphite gimbals in the fighting butt.
  • Chartreuse “Strike Tip”- The bright chartreuse “Strike Tip” enhances early strike detection even in low light conditions and quickly alerts you to even the lightest bites, so you never miss a fish. The “Strike Tips” are also great for night fishing but equally well in bright sunlight.
  • Casting and Spinning Models – KastKing KONG Rods are available in both Casting and Spinning models in both 1 and 2 pc. Line ratings range from 15-40 lbs. for the 7’6” spinning model all the way to 50-100 lbs. for the 6’6” 1 pc casting rod. Lure ratings range from 2-8 oz to 8-32 oz. If you are targeting big fish in fresh or saltwater, there is a KastKing KONG rod that will get the job done for you.

Overview

  • Brand: KastKing
  • Material: Graphite
  • Number of Pieces: 1
  • Fishing Technique: Spinning
  • Model Name: KRDSPNKG-7M2
Quantity

Low stock: 10 left

View full details
  • ⭐⭐⭐⭐⭐

    Michael Turner — Tampa, Florida

    I ordered a few fishing accessories from Reelora, and everything felt practical and easy to use. The gear helped me keep my tackle more organized, and the products fit well into my usual weekend fishing routine.

  • ⭐⭐⭐⭐⭐

    Ryan Miller — Austin, Texas

    Reelora has a useful selection of fishing gear for everyday anglers. I picked up a few small tools and storage items, and they made my setup feel cleaner, easier to carry, and more prepared for a day by the water.

  • ⭐⭐⭐⭐⭐

    Daniel Brooks — Seattle, Washington

    The products I ordered were simple, functional, and exactly the kind of fishing essentials I needed. I like that Reelora focuses on useful gear rather than making things feel complicated. I would shop here again.

  • ⭐⭐⭐⭐⭐

    Jason Reed — Portland, Oregon

    I bought a few items to upgrade my fishing setup, and they have been helpful for organizing rods, tackle, and small accessories. Everything felt easy to understand, easy to store, and practical for regular fishing trips.

FAQ

What types of products does Reelora sell?

Reelora offers fishing gear and fishing accessories, including fishing rods, reels, rod and reel combos, fishing line, lures, baits, hooks, tackle storage, fishing tools, nets, rod holders, and everyday fishing accessories.

How much does shipping cost?

We offer flat-rate shipping for $6.90 per order. Shipping fees are shown at checkout before your payment is completed.

How long does order processing take?

Orders are typically processed within 1–3 business days, Monday through Friday, excluding holidays. During busy periods or high demand, processing may take up to 5 business days.

How long will delivery take?

Estimated delivery within the United States is typically 5–10 business days after shipment. International delivery, when available, may take approximately 10–20 business days depending on destination, customs, and carrier handling.

How can I track my order?

Once your order has shipped, tracking information will be sent to the email address used at checkout. Please note that tracking updates may take 2–5 days to appear after shipment.

Can I change or cancel my order?

You may request a change or cancellation within 12 hours of placing your order, as long as processing or shipment has not started. Once fulfillment begins, changes or cancellations may no longer be possible.

What is your return policy?

Return requests must be submitted within 30 days of delivery. Items must be unused, in their original condition, and returned with original packaging, accessories, and proof of purchase. Please contact us before sending any item back.

What should I do if my item arrives damaged, defective, or incorrect?

Please contact us within 7 days of delivery with your order number and clear photos of the item and packaging. After review, we may offer a replacement, replacement parts, partial refund, or full refund depending on the situation.

How do I know which fishing product is right for me?

Please review the product description, size, material, intended use, and compatibility details before purchasing. Fishing gear may vary depending on fishing style, location, target species, and personal preference.

How can I contact Reelora customer support?

You can contact us by email at bhipalqaklopn@gmail.com. Please include your order number and a brief description of your question so we can assist you more efficiently. We typically respond within 1–2 business days.